#3 Bunker Liner Project

This was a bit difficult to believe, but all of the bunkers on this hole went very well. There was nothing unusual or difficult about any of these three bunkers. It was as simple as removing the sand, installing the liner, and loading the sand. All of the original edges were also untouched. The only area that needed a bit of attention was a bit of buildup on the fairway edge of the fairway bunker. For this, we packed a pile of DG on the edge to raise the slope and covered it with the bunker liner. This can be seen in a couple of the bottom photos.